Top Plastic Engineering Works

 

FABRICATED ITEMS
MOULDED ITEMS
POLYPROPYLENE VALVES
PP PIPE FITTINGS
HDPE PIPE FITTINGS
EXTRUDED ITEMS
PVC FLANGES
 
EXTRUDED ITEMS
 

Bill of Material

Sr.No.

Part

Qty.

Material

1.

Body

1

Polypropylene

2.

Ball

1

P.P.R.

3.

Flange End

2

Polypropylene

4.

Seat

2

PTEE(Teflon)

5.

Stem

1

P.P. Reinforced with M.S.

6.

Bearing

1

Teflon

7.

Stud & Nut

5 to 10

M.S. Zinc plated / S.S. 304 / S.S.316

8.

Body "O" Ring

2

Neoprene / Teflon

10.

Handle

1

P.P. Reinforced with M.S.

11.

Pin

1

S.S. 304

Bill of Material

Sr.No.

Part

Qty.

Material

1.

Body

1

Polypropylene

2.

Ball

1

P.P.R.

3.

Flange End

2

 
Copyright 2008 | Plastic Engineering Works. All Rights Reserved.
| | | |